Skip to main content Skip to search Skip to main navigation
Creative with glass
4,000sqm storage space
More than 40 years of experience
over 10,000 products
Go to homepage

CRYSTALCAST


    Mixing ratio:

    1kg powder + 0,32kg water
    ( like a mush)

    1,32kg mixing (1kg pwder + 0,32kg water) will be approx 0,7l mold mix

    hardening time approx 2-3 hours

    Drying out the mold:

    Is not necessary but a drying step at 150°C for 120 minutes.

    Fusing temperatures of the samples:


    Bullseye 810°C – 40 minutes
    System96 800°C – 30 minutes
    Float 845°C – 45 minutes